Precast Concrete Catchpit / Silt Trap — a worked example, measured four ways

The same assembly at default dimensions, rendered as a Bill of Quantities under each measurement standard. Switch the standard to see how the bill changes. Change the inputs in the calculator to compute your own.

CESMM4 · 13 items · units sum, nr, m³, m²

CodeDescriptionUnitQuantity
A.4.1Provisional sum (Prime Cost): Frame & cover, D400 loading, 600mm clear opening, with 150mm adjustment ringssum1
A.4.1.fixFixing only: Frame & cover, D400 loading, 600mm clear opening, with 150mm adjustment ringsnr1
E.4.3.5Excavation for foundations, maximum depth 2-5m68.85
E.5.3Disposal of excavated material off-site4.81
E.6.3.2Filling, imported selected granular material, Class 6N to SHW0.4
E.6.2.1Filling, excavated material64.04
E.6.5.1Filling, imported sub-base, Class 6N per SHW 601 Table 6/1 row 6N0.38
L.5.2Granular surround to pipe, 20mm single-size aggregate0.86
K.1.6.2Precast concrete catchpit / silt trap to BS 5911-3, 1200mm internal diameter, depth to outlet invert 2.5m, with integral silt sump 750mm below invert (silt capacity ~848L)nr1
K.1.3.1Precast concrete chamber ring to BS 5911-3, 1200mm internal diameter, 500mm depthnr4
K.1.5.1Precast concrete cover slab to BS 5911-3, 1500mm outer diameter, 600mm clear openingnr1
K.8.1Galvanised step irons cast into precast rings, 300mm centresnr7
E.7.2Geotextile filter, 200 g/m², including laps6.84
● MATERIAL SCHEDULE

Procurement take-off: the total quantity to order of each material, from the same compute. Supplier-neutral, so you buy anywhere.

  • Disposal4.81
  • Excavation Foundation68.85
  • Fill General64.04
  • Fill Selected0.4
  • Fill Sub Base0.38
  • Geotextile Filter6.84
  • Manhole14 nr
  • Manhole1 sum
  • Pipe Surround0.86

Illustrative example at default dimensions · engine ref 7f9967 · not a tendered quantity