Calculator · Paid tier← All calculators

Precast Concrete Kerb Run Quantity Calculator

Precast concrete kerb run to BS EN 1340 on a concrete bed with concrete haunching and Type 1 granular sub-base. Computes excavation, sub-base, bed concrete, kerb units (m), haunch concrete, optional channel block, and disposal per CESMM4 R.7, NRM2 34.10, MMHW Series 1100, and SMM7 Q10.

Slug · kerb_run · v1.0

Paid tier

Subscribe or buy a pass to compute this assembly

Paid assemblies surface their parameter forms, BoQ output, project save/reload, and full per-standard Excel + DXF + PDF deliverables once a CivilQuants subscription or 7-day pass is active. Per-standard bills across CESMM4, NRM2, SMM7, and MMHW; project-level recompute; watermark-free outputs.

Precast Concrete Kerb Run — a worked example, measured four ways

The same assembly at default dimensions, rendered as a Bill of Quantities under each measurement standard. Switch the standard to see how the bill changes. Change the inputs in the calculator to compute your own.

CESMM4 · 7 items · units m³, m

CodeDescriptionUnitQuantity
E.4.3.3Excavation for foundations, maximum depth 0.5-1m7.58
E.5.3Disposal of excavated material off-site5.18
E.6.2.1Filling, excavated material2.4
E.6.5.1Filling, imported sub-base, Class 1A (granular) per SHW 601 Table 6/1 row 1A1.88
F.5.2.3In-situ concrete C20/25, kerb bed, thickness exceeding 500mm1.88
F.5.2.3In-situ concrete C20/25, kerb haunch, thickness exceeding 500mm0.29
R.7.1.1Precast concrete kerb, Type HB2, 150×305mm, to BS EN 1340 / SHW Cl. 1101, bedded and haunched in concrete (concrete measured separately)m25
● MATERIAL SCHEDULE

Procurement take-off: the total quantity to order of each material, from the same compute. Supplier-neutral, so you buy anywhere.

  • Concrete Mass2.17
  • Disposal5.18
  • Excavation Foundation7.58
  • Fill General2.4
  • Fill Sub Base1.88
  • Kerb25 m

Illustrative example at default dimensions · engine ref 10f19a · not a tendered quantity