Rigid (Concrete) Pavement Build-Up Quantity Calculator

Rigid concrete pavement in unreinforced (URC), jointed reinforced (JRC), or continuously reinforced (CRCP) form per DMRB CD 226 and HD 26. Computes excavation, capping, sub-base, separation membrane, concrete slab (m³), reinforcement, and joints per CESMM4 Class R, NRM2 Group 34.7, MMHW Series 1000, and SMM7 Q21.

Slug · rigid_pavement · v1.0

Paid tier

Subscribe or buy a pass to compute this assembly

Paid assemblies surface their parameter forms, BoQ output, project save/reload, and full per-standard Excel + DXF + PDF deliverables once a CivilQuants subscription or 7-day pass is active. Per-standard bills across CESMM4, NRM2, SMM7, and MMHW; project-level recompute; watermark-free outputs.

Rigid (Concrete) Pavement Build-Up — a worked example, measured four ways

The same assembly at default dimensions, rendered as a Bill of Quantities under each measurement standard. Switch the standard to see how the bill changes. Change the inputs in the calculator to compute your own.

CESMM4 · 12 items · units m³, m², nr, m

CodeDescriptionUnitQuantity
E.4.2.2General excavation, maximum depth 0.25-0.5m, commencing from existing ground level133
E.5.3Disposal of excavated material off-site133
E.7.1Preparation of excavated surfaces, formation350
E.6.5.1Filling, imported sub-base, Class 1A (granular) per SHW 601 Table 6/1 row 1A52.5
R.5.1.3In-situ concrete pavement (JRC), C40/50, 230mm thick80.5
R.7.1.1Dowel bar, plain round, debonded one end, 25mm diameter (BS 8666 shape 00; bar marks D01)nr24
R.7.2.1Tie bar, deformed, fully bonded, 16mm diameter (BS 8666 shape 00; bar marks T01)nr67
R.5.2.1Fabric reinforcement to BS 4483, mesh designation A393, in concrete pavement slabs350
R.6.1Transverse contraction joint in concrete pavementm7
R.6.2Longitudinal construction joint in concrete pavementm50
R.6.5Slab edge formwork to concrete pavementm100
W.1.1Sheet polythene membrane, 125μm thick, separation/slip membrane under PQC slab, including all laps and dressings350
● MATERIAL SCHEDULE

Procurement take-off: the total quantity to order of each material, from the same compute. Supplier-neutral, so you buy anywhere.

  • Concrete Reinforced80.5
  • Disposal133
  • Excavation General133
  • Fill Sub Base52.5
  • Formation Prep350
  • Formwork157 m
  • Geomembrane350
  • Reinforcement350
  • Reinforcement91 nr

Illustrative example at default dimensions · engine ref df556b · not a tendered quantity