Calculator · Paid tier← All calculators

Infiltration Soakaway (CIRIA C753) Quantity Calculator

Infiltration soakaway sized to CIRIA C753 with storage envelope, infiltration surface area, and perforated distribution pipe. Computes excavation, granular fill, geotextile wrap, perforated pipe (m), infiltration surface area (m²), and disposal.

Slug · soakaway · v1.0

Paid tier

Subscribe or buy a pass to compute this assembly

Paid assemblies surface their parameter forms, BoQ output, project save/reload, and full per-standard Excel + DXF + PDF deliverables once a CivilQuants subscription or 7-day pass is active. Per-standard bills across CESMM4, NRM2, SMM7, and MMHW; project-level recompute; watermark-free outputs.

Infiltration Soakaway (CIRIA C753) — a worked example, measured four ways

The same assembly at default dimensions, rendered as a Bill of Quantities under each measurement standard. Switch the standard to see how the bill changes. Change the inputs in the calculator to compute your own.

CESMM4 · 11 items · units m³, m², m

CodeDescriptionUnitQuantity
E.4.2.5General excavation, maximum depth 2-5m, commencing from existing ground level258.85
E.5.3Disposal of excavated material off-site165.2
E.7.1Preparation of excavated surfaces, formation68
E.6.3.2Filling, imported selected granular material, Class 6N to SHW28
E.6.2.1Filling, excavated material93.65
L.5.1Granular bedding to pipe, 20mm single-size aggregate8.4
L.5.2Granular surround to pipe, 20mm single-size aggregate28.8
E.7.2Geotextile filter, 200 g/m², including laps197.97
I.8.1Modular geocellular attenuation crates, void ratio 30%100
E.7.4Soakaway infiltration formation in silty sand; prepare base and side walls below design water level without smearing or compaction, design rate 2.50e-05 m/s; surface to receive geotextile filter and granular fill per CIRIA C753 §25.4110
I.3.2Perforated HDPE distribution pipe, ID 150mm, laid within soakaway granular fill; perforations to BS EN 13476-3 or equal; geotextile-wrapped if specifiedm10
● MATERIAL SCHEDULE

Procurement take-off: the total quantity to order of each material, from the same compute. Supplier-neutral, so you buy anywhere.

  • Attenuation Crate100
  • Disposal165.2
  • Excavation General258.85
  • Fill General93.65
  • Fill Selected28
  • Formation Prep68
  • Geotextile Filter197.97
  • Infiltration Surface110
  • Perforated Distribution Pipe10 m
  • Pipe Bedding8.4
  • Pipe Surround28.8

Illustrative example at default dimensions · engine ref 12a31a · not a tendered quantity