Calculator · Paid tier← All calculators

SuDS Swale (CIRIA C753) Quantity Calculator

SuDS swale per CIRIA C753 and SHW Cl. 624 — shallow vegetated, geotextile-reinforced, or rip-rap lined trapezoidal channel. Computes excavation, topsoil strip, lining material, optional check-dams, and disposal.

Slug · swale · v1.0

Paid tier

Subscribe or buy a pass to compute this assembly

Paid assemblies surface their parameter forms, BoQ output, project save/reload, and full per-standard Excel + DXF + PDF deliverables once a CivilQuants subscription or 7-day pass is active. Per-standard bills across CESMM4, NRM2, SMM7, and MMHW; project-level recompute; watermark-free outputs.

SuDS Swale (CIRIA C753) — a worked example, measured four ways

The same assembly at default dimensions, rendered as a Bill of Quantities under each measurement standard. Switch the standard to see how the bill changes. Change the inputs in the calculator to compute your own.

CESMM4 · 6 items · units m³, m²

CodeDescriptionUnitQuantity
E.2Excavation of topsoil for re-use or disposal, maximum depth not exceeding 0.25m48.75
E.4.2.2General excavation, maximum depth 0.25-0.5m, commencing from existing ground level34
E.5.3Disposal of excavated material off-site60.03
E.7.1Preparation of excavated surfaces, formation151.49
E.6.1Filling, site-won topsoil, to landscaped areas22.72
E.7.5Grass seeding to prepared surfaces, amenity grass seed mix, BS 7370-3151.49
● MATERIAL SCHEDULE

Procurement take-off: the total quantity to order of each material, from the same compute. Supplier-neutral, so you buy anywhere.

  • Disposal60.03
  • Excavation General34
  • Formation Prep151.49
  • Grass Seed151.49
  • Topsoil Place22.72
  • Topsoil Strip48.75

Illustrative example at default dimensions · engine ref 10e209 · not a tendered quantity