Utility Kiosk Base Quantity Calculator
Reinforced concrete pad foundation and pedestal plinth for a utility kiosk (LV pillar, Openreach FTTC cabinet, EV charger, DNO substation, or generic plinth). Computes excavation, blinding, RC pad and pedestal, formwork, reinforcement, and kiosk hardware (Nr) with supply-route-aware PC sums.
Slug · utility_kiosk_base · v1.0
Paid tier
Subscribe or buy a pass to compute this assembly
Paid assemblies surface their parameter forms, BoQ output, project save/reload, and full per-standard Excel + DXF + PDF deliverables once a CivilQuants subscription or 7-day pass is active. Per-standard bills across CESMM4, NRM2, SMM7, and MMHW; project-level recompute; watermark-free outputs.
Utility Kiosk Base — a worked example, measured four ways
The same assembly at default dimensions, rendered as a Bill of Quantities under each measurement standard. Switch the standard to see how the bill changes. Change the inputs in the calculator to compute your own.
CESMM4 · 10 items · units sum, nr, m³, t, m²
| Code | Description | Unit | Quantity |
|---|---|---|---|
| A.4.3 | Provisional sum (Statutory undertaker): DNO LV feeder pillar, GRP enclosure, IP44, ENA TS 35-1 (utility-provider-supplied complete unit) | sum | 1 |
| A.4.3.fix | Attendance on statutory undertaker: DNO LV feeder pillar, GRP enclosure, IP44, ENA TS 35-1 (utility-provider-supplied complete unit) | nr | 1 |
| E.4.3.2 | Excavation for foundations, maximum depth 0.25-0.5m | m³ | 0.5 |
| E.5.3 | Disposal of excavated material off-site | m³ | 0.09 |
| E.6.2.1 | Filling, excavated material | m³ | 0.41 |
| F.1.1.1 | In-situ concrete blinding, C8/10, thickness 75mm | m³ | 0.03 |
| F.6.2.3 | In-situ reinforced concrete C32/40, pad foundation with pedestal | m³ | 0.13 |
| G.5.1.3 | Reinforcement, high-yield steel bars to BS 4449 grade B500B, 10mm diameter, straight bars (BS 8666 shape 00; bar marks 01, 02) | t | 0 |
| G.5.2.3 | Reinforcement, high-yield steel bars to BS 4449 grade B500B, 10mm diameter, bent bars (BS 8666 shape 41; bar marks 05) | t | 0 |
| G.1.4 | Formwork to vertical and battered faces | m² | 1.1 |
Procurement take-off: the total quantity to order of each material, from the same compute. Supplier-neutral, so you buy anywhere.
- Concrete Blinding0.03 m³
- Concrete Reinforced0.13 m³
- Disposal0.09 m³
- Excavation Foundation0.5 m³
- Fill General0.41 m³
- Formwork1.1 m²
- Manhole1 nr
- Manhole1 sum
- Reinforcement0 t
Illustrative example at default dimensions · engine ref b10065 · not a tendered quantity